HomeProject Portfolio › IH-94 East-West

IH-94 East-West Maintenance
- Waukesha County

Interstate lifecycle maintenance between STH 83 and CTH T - inspected, documented, and surveyed while Waukesha County kept driving.

Location: Waukesha County, WI  ·  Corridor: IH-94, STH 83 to CTH T  ·  Role: Construction Inspection · Survey Support

Lifecycle maintenance kept this stretch of IH-94 in service: concrete base patching, joint repair, shoulder adjustments, ramp widening, guardrail and crash cushion installation, ditch corrections, and storm and culvert replacement. As a subconsultant to Patrick Engineering, Lynch provided construction inspection and survey support for the contractors, much of it under night closures.

Keeping an Interstate in Service

Interstates do not get to close for maintenance - the work happens around the traffic. On IH-94 between STH 83 and CTH T in Waukesha County, a lifecycle maintenance program renewed the corridor piece by piece: concrete base patching and joint repair in the mainline, shoulder adjustments, ramp widening, new guardrail and crash cushions, ditch corrections, and storm sewer and culvert replacement.

Lynch & Associates, as a subconsultant to Patrick Engineering, provided construction inspection and survey support for the contractors - verifying line and grade, documenting quantities, and keeping the paperwork as current as the pavement, with much of the work delivered under night closures where the production windows are short and the documentation still has to be right.

Interstate maintenance is a rhythm our team knows well - the same inspection discipline behind our I-41 North-South corridor work and IH-43 Moorland-to-Hale, delivered through the WisDOT process.

Milling train working under lights during a night closure on IH-94
Wet IH-94 corridor at night with the maintenance convoy working ahead Milling machine loading a dump truck during night operations on IH-94 Milling train at work under portable lighting in the closed lane

What We Delivered

Construction Inspection

Base patching, joint repair, shoulder, and ramp work inspected and documented - quantities verified for every pay item.

Survey Support for Contractors

Line and grade delivered to the crews under traffic and at night, keeping production moving inside short closure windows.

Roadside Safety Elements

Guardrail and crash cushion installations inspected to standard along the renewed corridor.

Drainage Renewal

Ditch corrections plus storm sewer and culvert replacements that keep water off an interstate that never stops.

← Back to All Projects